Curtain wall system

News

Contact

Guangdong Weguard Construction Technology Co., Ltd.

Tel:0757-85805535

Fax:0757-85805026

E-mail:sale@weguards.com

Address: Baishe Xiashe Industrial Zone, Hongxing Village, Guanyao, Shishan Town, Nanhai District, Foshan City, Guangdong Province

Website:www.weguards.com

Fireproof window installation requirements

Your current location: Home >> News >> Common problem

Fireproof window installation requirements

Date:2018-07-05 Author:admin Click:

Fireproof window installation requirements:


    1、When accepting the goods, Customer shall carefully check the quantity, specifications, grades and various accessories according to the supply contract to be qualified and complete.


  2、Storage and storage of fireproof windows should be stored vertically in a dry room, and anti-corrosion measures should be taken. The glass should be placed on the surface and the object should not be damaged on the edge of the glass and the glass surface.

 

防火窗系统


 3、Installation

 (1)The fireproof window must be inspected before installation. If the window frame, window sash is warped, deformed or damaged due to inadvertent transportation and storage, it should be repaired before installation.

 

 (2)When the fireproof window is installed, it should be leveled with a horizontal ruler or the vertical line of the front, back, left and right by the hanging line method, so as to be horizontal, vertical and high.

 

 (3)The window frame must be integral with the building and connected to the wall by wood or iron. After the steel window frame is installed, the cement mortar must be poured between the rear window frame and the wall, and it can be used normally for 24 hours.

 

 (4)The position of the mounting holes of the hardware components should be accurate, so that the hardware fittings can be installed flat and firm, and meet the requirements for use.

  

  (5)When the fireproof glass is installed, the four sides must be evenly spaced. After positioning, fill the four side gaps with fireproof cotton, and then seal the edge strips.

  

  (6)In addition to the above requirements, the installation shall be carried out in accordance with the requirements of the "Construction and Acceptance Specifications"


Article url:http://en.weguards.com/news/420.html

Tags:Firewindowinstallationrequirements

Browse:

Copyright © http://en.weguards.com/ Guangdong Weguard Construction Technology Co.,Ltd. Specializing inSteel bar,Fireproof window system,curtain wall,Welcome to inquire!
粤ICP备14013975号  Powered by Clouds platform  Technical Support:CEALL
Share 一键分享
Welcome to leave us a message
Please enter the message here, we will contact you as soon as possible.
Name
Contacts
Phone
Phone
Email
Email
Address
Address